Skip to content
GEOGRAPHYUSCanadaMexicoEuropeAsiaPLATFORMSGB300 NVL72B300MI355XMI350PBARE METALRoot accessManaged optionalSTANDARDTier II+ and Tier IIISingle or multi-tenantDEPLOYIn as little as 4 weeks
GEOGRAPHYUSCanadaMexicoEuropeAsiaPLATFORMSGB300 NVL72B300MI355XMI350PBARE METALRoot accessManaged optionalSTANDARDTier II+ and Tier IIISingle or multi-tenantDEPLOYIn as little as 4 weeks
DATA CENTER SITE SELECTION / ADVISORY / VENDOR AGNOSTIC

The right facility
for the cluster.

We match your cluster to a facility from our network of independent Tier II+ and Tier III data centers across the US, Canada, Mexico, Europe, and Asia. GPU engineers check power, cooling, density, and readiness, not just square footage.

Retainer or phased engagement / scope in writing

At a glance
Regions
US, Canada, Mexico, Europe, Asia
Facilities
Tier II+ and Tier III
Typical size
5 to 20 MW
Range
2 to 100 MW
Engagement
Retainer or phased
A01 / WHAT'S INCLUDED

What you get.

01

Requirements brief

Power, density, cooling type, geography, latency, data residency, and term written into one brief facilities can answer.

02

Shortlist from our network

Facilities matched to the brief, with the tradeoffs between them laid out plainly.

03

Engineering due diligence

Power availability and dates, cooling capacity, floor loading, network carriers, and security reviewed by engineers.

04

Attestation review

Each facility's certifications, such as SOC 2 or ISO 27001 where held, reviewed and shared under NDA.

05

Commercial support

Colocation terms, power pricing, expansion rights, and ramp schedules negotiated with you.

A02 / SPECIFICATION

Scope and deliverables.

Scoped per engagement. Your proposal names the phases, deliverables, and the engineers on them.

Power
Capacity
Available and committed
Timeline
Energization dates checked
Redundancy
Reviewed per facility
Expansion
Rights to grow
Cooling
Air
High-density air
Liquid
Direct-to-chip readiness
Loop
Secondary water reviewed
Density
Matched to the platform
Site
Tiers
Tier II+ and Tier III
Structure
Floor loading checked
Network
Carriers and diversity
Security
Attestations under NDA
Deliverables
Brief
Requirements document
Shortlist
Compared facilities
Diligence
Engineering findings
Terms
Negotiated term sheet
A03 / WHO IT'S FOR

Where this fits.

Hardware owners without a home

Teams that bought or are buying GPUs and need somewhere ready to put them.

Regional and sovereign needs

Organizations that need compute in a specific country or region.

Fast-growing fleets

Operators planning the next 5 to 20 MW who want options beyond their current provider.

A04 / HOW WE ENGAGE

How the work runs.

Phased, with a written deliverable at every gate. Stop after any phase, or keep us on retainer.

  • Brief: requirements captured in one document.
  • Shortlist: matched facilities from our network with tradeoffs explained.
  • Diligence: engineering and attestation review, including site visits where needed.
  • Terms: colocation and power terms negotiated with you.
  • Move-in: coordination with design, procurement, and acceptance testing.
A05 / REQUEST A QUOTE

Tell us what you are building.

An engineer replies with a proposed scope and engagement plan. No pricing on the website, no sales sequence.

contact@crystalcloud.ai / Los Angeles, CA

Request a cluster quote
~2 MINUTES

Tell us the shape of the cluster. An engineer replies with a configuration and a deployment window, not a sales sequence.

Single-tenant or multi-tenant bare metal, managed services optional. Deploy in as little as 4 weeks, with your window confirmed in writing before you commit.